Talk to a licensed installer Straight answers, no obligation.

Designing for future expansion — added bedrooms, guest house, ADU, barndominium, shop bathroom.

State rules are the floor. Figures here are TCEQ minimums under 30 TAC Chapter 285. Your county can be stricter and around here most are — check your county before you rely on a number.

Chapter 285 has no general "design for future expansion" requirement, but the sizing rules mean expansion is not free. Design flow is driven by bedroom count and square footage, so adding bedrooms, a guest house, a shop bathroom or a barndominium raises the required flow — and that makes the project an alteration, which needs a permit.

The practical advice is simple: tell your designer what you are actually planning. If a second structure or another bedroom is coming in three years, say so while the system is being sized. Sizing up front is far cheaper than redesigning a system that has already been installed.

Two specific traps. Adding a second dwelling voids the 10-acre exemption, which requires the home to be the only dwelling on the tract. And accessory structures are handled by local order rather than state rule, so what counts as a guest house versus a second dwelling depends on your county.

Reviewed August 2026. Links go to the sources this answer was checked against.