Soil profile analysis vs percolation test — which Texas requires, when each is allowed, how each is performed under 30 TAC 285.
State rules are the floor. Figures here are TCEQ minimums under 30 TAC Chapter 285. Your county can be stricter and around here most are — check your county before you rely on a number.
Texas requires a soil profile analysis: §285.30(b) prescribes two borings or backhoe pits excavated to two feet below the adopted excavation of the disposal area or to a restrictive horizon (whichever is less), followed by texture classification, gravel analysis, restrictive-horizon determination and groundwater observation — the rule text contains no percolation-test procedure (30 TAC §285.30), and the TCEQ rules compilation likewise states no percolation-test requirement or procedure, listing only the profile/texture-based site evaluation (TCEQ RG-472, OSSF Rules Compilation). The shift dates to the December 1996 rule revisions, which "eliminate the percolation test as the sole factor for determining whether an OSSF is feasible for a particular site" and "establish a site evaluation process based on soils analysis" (Texas Water Resources Institute, Insights). Sizing therefore keys off soil class rather than a perc rate; a permitting authority may require additional borings or pits in areas of high soil variability, and disputes over groundwater are resolved with the county NRCS soil survey or a certified professional soil scientist (30 TAC §285.30).
Reviewed August 2026. Links go to the sources this answer was checked against.
More on design & engineering
- What a site evaluation is and what the evaluator actually tests and documents.
- How design loading rate translates into drainfield square footage or spray-area size.
- When a Professional Engineer's seal is required on the design instead of a site evaluator's or installer's plan.
- Designing around hard site limits: shallow bedrock, high water table, steep slope, restrictive horizon, tight lot.
- Setback and separation distances under 30 TAC 285.91(10) — actual table numbers.
- Spray field layout — required coverage area, keeping spray within property, landscaping and planting restrictions over the field.
All design & engineering questions · County permitting offices